Nanning City, Guangxi City Nasha Area Wei 5 Road (Youyi Road - Qiuyue Road Extension)
Category:
municipal engineering
Keywords: engineering construction
Construction period of the project: 2022.03 to 2023.03; The project is road development,
Construction period of the project: 2022.03 to 2023.03; The project is road development,
Contain:
1. The total length of the road is 1273 meters, and the width of the red line is 32 meters of urban secondary trunk roads
2. Build pipe corridors (pipelines) and fire hydrants according to the plan