Hubei Yichang City Dian Military District Jiangnan Avenue Scroll Bridge River Bridge Project

Category:

Bridge tunnel

Keywords: engineering construction

Construction period of this project: December 2021 to January 2022; The project is a bridge development,

Construction period of this project: December 2021 to January 2022; The project is a bridge development,

Contain:
1. The total length is 126.9 meters, the total width is 33.5 meters, and the total access road on both sides of the bridge head is about 250 meters
2. Facilities such as wiring on both sides of the bridgehead